“4 trays? 4 trays”: the shocking photo that River Plate published about the works in the Monumental stadium & More Latest News Here - Up Jobs

2022-08-27 03:07:58 By : Mr. peter xie

The works in the More Monumental stadium do not stop and as River Plate will visit Tigre in Victoria this Saturday from 8:30 p.m. for date 16 of the Professional League, the club advanced with the tasks in various stands attached to the field of play. Although they shared several images and videos, there was a post that got attention of supporters.

“4 trays? 4 trays”, they wrote next to the English word “soon”, which means “early”. The vertical photo shows one of the heads of the stadium with the changes in the four stands. The posting on Twitter alone had more than 17 thousand likesalmost 1,500 retweets and dozens of comments in just two hours. This Wednesday and Thursday the historic wooden seats began to be removed from the Sivori Baja stalls and in a short time they will be replaced by the new ones.

The truth is that the Antonio Vespucio Liberti it will become the first court in the country to hold four trays, after the creation of a new lower ring where the athletics track used to be. This will also allow fans to be even closer to the action. With these works that will completely remodel the Monumental stadium, the sports venue will become the one with the largest capacity in all of South America: 81,000 spectators.

This first stage of the reforms, which will cost approximately 20 million dollars, is focused on the creation of three of the four lower tribunes: Sívori, Centenario and San Martín. The Belgrano, on the other hand, will be held in the next phase, since the River Plate Institute must first be moved (it could be within the club or on a nearby property). It is scheduled for completion in February 2023.

Another important detail is that the Monumental will go on to have a single entrance tunnel from the campuses to the playing field, which will be located between the two benches of substitutes. In addition to the high screen located above the High Sívori, there will be another one in the Centenario. both will be extra wide panoramic screens and will be three times the size of the current one.

On the other hand, the distribution of the public will be modified, since 71% of the locations will be stalls and the remaining 29% popular. Both behind the arch of the Sívori grandstand and the Centenario, in the current low, plus the lower low to be built, will be popular. Then there will be the lower side stalls, the San Martín and Belgrano stalls and the entire ring of middle stalls. In the case of Centenario and Sívori, these stalls will have no connection with the popular ones.

The latest publications of River Plate with the renovations in the stadium:

THE DETAIL OF THE WORKS:

– New lower lower grandstands in the Sívori, San Martín and Centenario sectors.

-Change of seats: removal of existing seats, waterproofing, new circulations and placement of new first-class retractable seats, quality according to FIFA standards, in San Martín lower, upper, middle and hospitality stands; Belgrano low top, middle, hospitality and boxes; Media centennial and boxes. A total of 17,157 new seats will be completed for this phase.

-The Press sector will have new desks in the middle Belgrano grandstand (247 seats).

-30 boxes in Centenario media and a 700-square-meter restaurant with views of the River neighborhood and the playing field, with new circulations and coverings.

-New circulation and coverings in boxes in the Belgrano grandstand.

-New garages: new parking level and covered pedestrian access on the ground floor to the Stadium. 227 garages will be added.

-Enlargement of the Paddock San Martín, since it will go from 200 to 500 square meters.

-Expansion of the gastronomic sector in San Martín media

-New audio system in the Stadium.

-New Medical Department on the ground floor of the Centenario grandstand.

-New Lower Lower Belgrano Grandstand.

-Change of seats and waterproofing in the lower Belgrano lower stands; Sívori media and boxes; San Martín, Belgrano, Centenario and Sívori high. A total of 40,565 seats will be changed, completing the entire Stadium.

-Creation of 46 boxes in the Sívori grandstand.

-Execution of two more parking levels. In this way, there will be 402 new garages, completing the five parking levels and a new pedestrian bridge on the upper level, with connection at the box level. It will have a final capacity of 1,141 cars.

-New mixed area on the ground floor of the Belgrano grandstand.

All this news that I have made and shared for you people, you will like it very much and in it we keep bringing topics for you people like every time so that you keep getting news information like trending topics and you It is our goal to be able to get

all kinds of news without going through us so that we can reach you the latest and best news for free so that you can move ahead further by getting the information of that news together with you. Later on, we will continue

to give information about more today world news update types of latest news through posts on our website so that you always keep moving forward in that news and whatever kind of information will be there, it will definitely be conveyed to you people.

All this news that I have brought up to you or will be the most different and best news that you people are not going to get anywhere, along with the information Trending News, Breaking News, Health News, Science News, Sports News, Entertainment News, Technology News, Business News, World News of this made available to all of you so that you are always connected with the news, stay ahead in the matter and keep getting today news all types of news for free till today so that you can get the news by getting it. Always take two steps forward

Credit Goes To News Website –  This Original Content Owner News Website . This Is Not My Content So If You Want To Read Original Content You Can Follow Below Links